Real transformations, clean finishes.
Every project starts with the frame. These are the ones that showed it.
After: Full frame inspection, replaced ledger and flashing, capped composite surface
Before: Rot at ledger, soft boards
Solution: Full frame inspection, replaced ledger and flashing, capped composite surface
Material: Composite
Weathered Wood Deck Replacement
Timeline: 10–14 days
After: Frame verified, surface replaced with capped composite and picture-frame border
Before: Cosmetic wear, sound frame
Solution: Frame verified, surface replaced with capped composite and picture-frame border
Material: Composite
Composite Deck Resurfacing
Timeline: 5–7 days
After: Post structure rebuilt, aluminum railings, new stair system
Before: Wobbly rails, loose stringers
Solution: Post structure rebuilt, aluminum railings, new stair system
Material: Aluminum
Railing & Stair Safety Upgrade
Timeline: 4–6 days
After: New 12x14 deck with wide stairs and privacy panel
Before: No usable outdoor space
Solution: New 12x14 deck with wide stairs and privacy panel
Material: Composite
Small Backyard Deck Build
Timeline: 7–10 days
After: Rebuilt frame and stair transitions, composite surface
Before: Aging two-level wood deck
Solution: Rebuilt frame and stair transitions, composite surface
Material: Composite
Two-Level Deck Replacement
Timeline: 14–18 days
After: Advanced PVC deck resistant to standing water
Before: Constant moisture damage
Solution: Advanced PVC deck resistant to standing water
Material: PVC
PVC Deck Upgrade Near Pool
Timeline: 8–12 days